FRA addresses speed and curves on ALL passenger corridors

Listen to this article

The Federal Railroad Administration (FRA) issued an Emergency Order that will assist in controlling passenger train speeds at certain locations on the Northeast Corridor (NEC). Today’s order is the latest in a series of actions the FRA has taken in the wake of last week’s derailment of Amtrak Train #188. 

FRA also announced today its intention to take additional actions in the coming days to address potential speed issues on all other passenger corridors.

Last Saturday, FRA instructed Amtrak to immediately take several actions to improve safety along the NEC.  As stated in that weekend announcement, today’s Emergency Order formalizes those instructions.

“Although we do not yet know what caused the derailment of Amtrak Train #188, the information we do have underscores the need to continue to do all we can to further promote safety along the Northeast Corridor,” said U.S. Transportation Secretary Anthony Foxx. “Today’s action will help prevent similar incidents from occurring on the NEC until Amtrak completes its installation of Positive Train Control later this year.”

The Emergency Order requires Amtrak to take a series of steps to improve safety along the Northeast Corridor, including implementing Automatic Train Control (ATC) code changes and modifications, adopting other safety procedures at several curve locations with significant speed reductions, and submitting an action plan to FRA outlining additional steps.

FRA will take additional steps in the coming days and weeks to ensure other corridors are addressing potential over-speed issues as well.

“The Northeast Corridor is the busiest rail corridor in the country, and the steps we have ordered Amtrak to take will immediately improve safety on this busy corridor,” said Acting Federal Railroad Administrator Sarah Feinberg. “But in the days and weeks to come, we will also do more – while FRA will continue to push Amtrak and other commuter lines to achieve full implementation of Positive Train Control, we will also work with them in the short term to immediately address potential over-speed issues.”

The Emergency Order requires Amtrak to immediately implement a code change to its ATC system near the Frankford Junction curve in Philadelphia, Pennsylvania. The change must enforce the passenger train speed limit of 50 mph, or lower, for northbound trains approaching the curve. Amtrak implemented this change prior to the restart of service on Monday.

In addition, Amtrak must survey the NEC to identify each main track curve where there is a reduction of more than 20 mph from the maximum authorized approach speed to that curve for passenger trains, and provide a list of each location to the FRA.

Following Amtrak’s identification of the curves referenced above, Amtrak must develop and submit an action plan to FRA that accomplishes each of the following:

  • Identify appropriate modifications to Amtrak’s existing ATC system or other signal systems (or alternative operational changes) to enable warning and enforcement of applicable passenger train speeds at identified curves. 
  • Target dates for implementing each identified modification to Amtrak’s existing ATC system or other signal systems (or alternative operational changes) to enable warning and enforcement of passenger train speeds at the identified curves. 

 Amtrak must submit the action plan to the FRA within 20 days of the date of the Emergency Order.

In addition, Amtrak must begin to install additional wayside signage alerting engineers and conductors of the maximum authorized passenger train speed throughout its Northeast Corridor system no later than 30 days after the date of the order.

Magazine & eNewsletter

Printed Monthly Magazine

Published monthly, Material Handling Wholesaler offers feature columns and special coverage of relevant industry issues and products.

Digital Monthly Magazine

Published on the fourth Thursday of each month, Material Handling Wholesaler offers feature columns and special coverage of relevant industry issues and products.

Material Handing Wholesaler Weekly Newsletter

Our Weekly newsletter is emailed every Tuesday and contains the latest Industry Events and People News, Source Directory, and important Industry Links.

Forklift International Weekly Hot Sheet Newsletter

Published every Monday morning with the latest material handling equipment
available for sale.

Share the Post:

Related Posts

Our Current Issue

Magazine & eNewsletter

Our magazine is published and mailed monthly, Material Handling Wholesaler offers feature columns and special coverage of important industry issues. 

Weekly Newsletter – Get the latest industry events and people news in this weekly e-newsletter as well as direct access to Wholesaler’s Source Directory and link.

Current Supplements







Arnold Magnetic Technologies highlights the PLASTIFORM® High Energy Flexible Magnets, Made in America

Listen to this article Arnold Magnetic Technologies Corporation (Arnold), a subsidiary of Compass Diversified and a global manufacturer of high-performance…

Plezia named Port of Long Beach Engineering Managing Director

Listen to this article The Port of Long Beach has promoted Suzanne Plezia, P.E., to Managing Director of Engineering Services…

Ati Motors introduces the Sherpa 10K: High-capacity Autonomous Tug designed for demanding industrial workflows

Listen to this article New heavy-duty vehicle sets a new standard for autonomous material movement Ati Motors, a global provider…

Gebrüder Weiss renews scholarship program for Rutgers Business School

Listen to this article Gabriel Godoi De Lima, Jun Pak, and Nikhil Walia are 2025 scholarship recipients  Gebrüder Weiss has announced…

NY/NJ Foreign Freight Forwarders & Brokers Association Announces 2025 “Captain of Industry” Award Recipient

Listen to this article Charlene Riley to be Honored at June 25th Dinner Cruise Co-Hosted with the Traffic Club of…