Port reaches milestone at Long Beach Container Terminal

One of the world’s cleanest, most advanced terminals completed

The Port of Long Beach ushered in the next era of environmentally sustainable operations today with the completion of the Long Beach Container Terminal at Middle Harbor, one of the most technologically advanced cargo facilities in the world.

Equipped with nearly all-electric and zero-emissions equipment, LBCT at Middle Harbor is designed to strengthen competitiveness, improve cargo flow and dramatically enhance air quality amid an era of significant growth at the nation’s second-busiest seaport.

Robert Garcia headshot
Robert Garcia

“We are proud to have one of the greenest ports in America in the Port of Long Beach,” said Long Beach Mayor Robert Garcia. “The completion of this new terminal is a testament to our city’s continued commitment to sustainability and green technology.”

Port of Long Beach Executive Director Mario Cordero image
Mario Cordero

“As the world’s first all-electric, zero-emission mega terminal, LBCT sets the industry standard for moving cargo sustainably while keeping the Port competitive and supporting vital jobs,” said Mario Cordero, Executive Director of the Port of Long Beach. “It is truly a technological marvel that will allow us to increase our throughput, improve air quality and maintain our status as a leading gateway for trans-Pacific trade.”

Steven Neal headshot
Harbor Commissioner Steven Neal

“This new terminal charts a new course for greener cargo operations and strengthens our ongoing commitment to the Green Port Policy and San Pedro Bay Ports Clean Air Action Plan enacted about 15 years ago,” said Long Beach Harbor Commission President Steven Neal. “We thank our partners at Long Beach Container Terminal for collaborating with us over the past decade to develop the most advanced, greenest terminal in the world.”

“The final phase of LBCT at Middle Harbor adds container capacity to the Port of Long Beach and ensures the speedy, secure, and sustainable delivery of millions of cargo containers for decades to come,” said Long Beach Container Terminal CEO Anthony Otto. “We would like to thank our partners at the ILWU and the Port of Long Beach for making this project a reality.”

Construction of the $1.493 billion projects started in May 2011. The first part of the terminal opened five years later with the completion of Phase 1, allowing the terminal to begin operations across an initial 151 acres. Phase 2 wrapped up in October 2017, expanding the facility to 191 acres.

The third and final phase concluded in July, growing the terminal to 300 acres with a completed container yard, an administration building and an on-dock rail yard designed to handle 1.1 million TEUs annually to minimize truck traffic on local roads and freeways. Additionally, 14 of the most modern ship-to-shore gantry cranes line a new, 4,200-foot-long concrete wharf capable of welcoming three massive ships at once, making the Port of Long Beach “big ship” ready for the future. Another 3 acres will be added in 2025 with the opening of the North Gate Expansion, completing the terminal with 303 acres.

All ships calling at the terminal plug into shore power connections while berthed, allowing them to shut down diesel engines and connect to the landside electrical grid. All major structures are built with features to save power and water, meeting strict gold-level Leadership in Energy and Environmental Design (LEED) standards.

With an annual capacity of 3.3 million TEUs, LBCT by itself would rank as America’s sixth-busiest seaport, capable of moving twice the cargo with less than half of the air pollution of the two terminals it replaces.

Increased trade moving through the terminal is generating 14,000 permanent new jobs in Southern California. Additionally, unionized labor at LBCT operates the all-electric ship-to-shore cranes, staffs the control center for operations, and maintains the technology.

The Port of Long Beach is the nation’s second-busiest seaport. With 175 shipping lines connecting Long Beach to 217 seaports, the Port handles $200 billion in trade annually, supporting more than 575,000 Southern California jobs.

Free Magazine & eNewsletter

Printed Monthly Magazine

Published monthly, Material Handling Wholesaler offers feature columns and special coverage of relevant industry issues and products.

Digital Monthly Magazine

Published on the fourth Thursday of each month, Material Handling Wholesaler offers feature columns and special coverage of relevant industry issues and products.

Material Handing Wholesaler Weekly Newsletter

Our Weekly newsletter is emailed every Tuesday and contains the latest Industry Events and People News, Source Directory, and important Industry Links.

Forklift International Weekly Hot Sheet Newsletter

Published every Monday morning with the latest material handling equipment
available for sale.

Share the Post:

Related Posts

Our Current Issue

Free Magazine & eNewsletter

Our magazine is published and mailed monthly, Material Handling Wholesaler offers feature columns and special coverage of important industry issues. Subscription is FREE to qualified readers.

Weekly Newsletter – Get the latest industry events and people news in this weekly e-newsletter as well as direct access to Wholesaler’s Source Directory and link.

Current Supplements

Strong start to Q3 with 136 new Industrial Manufacturing Planned Industrial Projects

Industrial SalesLeads released its October 2024 report on planned capital project spending in the Industrial Manufacturing sector. The firm monitors…

Think CASH in ’25

Last month, I suggested that dealers compare their 24 results against their peers’ accounting and cash flow budgets. I also…

Assessing Machinery Dealer Fundamentals – A Strategic Approach

Are you ready for 2025? Here is a 60-question assessment of how well your business has adopted those fundamental Best…